EMC Celerra NX4 NAS Install In Pictures
So we received our 12tb raw EMC Celerra NX4 system(s) about 3 weeks ago. Eager to get going, I went ahead and racked the units. Below are pictures showing the different pieces that make up the NX4
- EMC Celerra NX4 Shipping Rack
- EMC Celerra NX4 Rails
- EMC Celerra NX4 Racked
- EMC Celerra NX4 Control Station – Front
- EMC Celerra NX4 Control Station – Rear
- EMC Celerra NX4 Drives
- EMC Celerra NX4 Bezels
- EMC Celerra NX4 Lights
Now all that we need to do is get some data over to it. We have a matching unit a few racks down that will be moved to our Tier 2 site once replication has been completed.
Notes: One thing to note is that the rails are an all in one unit. You can not change the order in which each device is racked. Also, the controllers (SPs) are built into the drive tray. Best part is that this will be wired up via 10gbE connectivity over fiber.
Advertisement








